Client
Project
Location
About the project
Design
The Speedscreen system simplifies planning and execution as there is no need to specify the exact location of support points during work preparation. Speedscreen distributes loads evenly over a large area. The Standard Screen slats were powder coated to match in with the planning requirements for this project. Tests with these products in an acoustic laboratory according to the ISO 10140-2 test method certify a sound insulation value of Rw 14 dB according to ISO 717-1:2020
Key features
– Speedscreen self supporting ballast weighted system
– Standard Screen PPC slats to visually conceal plant equipment
– Conforms to BS EN 516 2006 and BS EN 1090-3 2008
Installation
All components were prefabricated and delivered to the construction site as flat-pack kits, which led to a significant reduction in labor, time, and waste on site. The system enabled a clean and straightforward assembly process, making installation much easier. The installation of this project was completed within one week.
Configured Platforms is driven by its passion for reinventing Value Engineering concepts that are bold enough to break with tradition and bring to your project lighter, faster, smarter, surface mounted aluminium Platforms and leading edge acoustic solutions.

















