Client
Project
Location
About the project
Design
This system, developed by our in-house design team, was created to screen off the plant equipment without penetrating the roof membrane, utilizing a ballast weighted concept. The louvre profile blended seamlessly with the buildings façade. The team worked in close collaboration with the client to ensure full compliance with all roof specifications. The modular design offered flexibility, accommodating changes throughout the project.
Key features
– Speedscreen self supporting ballast weighted system
– Louvre100 – PPC blades to visually conceal the plant yet still allowing 70% free are for adequate airflow
– Conforms to BS EN 516 2006 and BS EN 1090-3 2008
Installation
The installation was successfully completed in just 5 days by a dedicated team of 3. Thanks to the flat-packed modular solution and detailed instructions, the entire process proceeded seamlessly, with no issues of missing parts or product waste. The installation team was impressed with the ease afforded by the modular design, making each step of the install straight forward and efficient.
Configured Platforms is driven by its passion for reinventing Value Engineering concepts that are bold enough to break with tradition and bring to your project lighter, faster, smarter, surface mounted aluminium Platforms and leading edge acoustic solutions.

















