PROJECT CASE STUDY - Serie 1 met Soundshield scherm en randbeveiliging

Naam project: Premier Inn Extension Scarborough

Projectlocatie: Scarborough, UK

Opdrachtgever: PDR Construction

Opdrachtsom: £ 16 000,00

Productomschrijving: Serie 1 platform met 1,6 m hoog geluidscherm

Overzicht: Dit 42m² Series 1 Platform met Soundshield Screen omranding aan twee zijden werd geleverd om de geluidoverlast voor de buren van de 10 Mitsubishi VRV-units op dit project te beperken.

PROJECT CASE STUDY - Serie 1 met Acoustic+ en standaard scherm

Projectnaam: St James University Hospital, Pathologielaboratorium - Leeds

Projectlocatie: Leeds, West Yorkshire

Opdrachtgever: BAM Construction Ltd - North East

Opdrachtsom: £ 185 000,00

Product Description: Series 1 platform with 3m high Acoustic+ screens with access landing and flue support structure.

Overview: Our solution eliminated a 200mm think concrete slab at roof height with all associated costs in time and hassle and allowed the roof to continue through over the complete area, significantly shortening the time it took to get the building to the watertight stage. With a total weight of 6 tonne instead of approximately 25-30 tonne this was a huge saving on the environment and well as the structural requirements. The complete 217m² 5kPa rated roof plant enclosure was installed in less than 2 weeks, with a crane required for one day only.

PROJECT CASE STUDY - Serie 1 met Peacemaker en overkapping voor installaties

Projectnaam: 22 Wyvil Road

Locatie van het project: Londen

Opdrachtgever: Kuropatwa Ltd

Opdrachtsom: £ 38 000,00

Product Description: Series 1 Platform with Peacemaker enclosure and roofed plantroom with no gaps to slats

Overview: This solution fulfilled the requirement of having air conditioning condensers needing airflow on one part of the platform and other equipment that needed to be in a plantroom. This complete structure was assembled in 2 days with the materials being brought to the roof via a materials hoist, as the site was very congested and would have required a road closure for a crane.

PROJECT CASE STUDY - Serie 1 met Acoustic+ en plafondbeugels

Project: Lewisham Exchange Studentenhuisvesting

Locatie van het project: Lewisham, Londen

Client: Tide Construction

Opdrachtsom: £ 17 000,00

Product Description: Series 1 platform with 2m high Acoustic+ screens

Overview: Due to the very constrained space down the side of the tallest modular building in the world this Acoustic+ enclosure was designed with overhead bracing to avoid having internal post braces. The base and sides were fabricated offsite to reduce the on-site build time to 3 hours.

PROJECT CASE STUDY - Serie 1 met Peacemaker scherm en lamellendak

Project: 3-5 Crutched Friars

Locatie van het project: Londen

Client: Zentura

Waarde: £ 19 000,00

Product Description: Series 1 platform with 2m Peacemaker screens and Louvred Roof

Overview: This acoustic enclosure was built off site and lifted to the roof as a completed unit. The louvred roof was removable and was lifted off to allow the 5 Daikin VRV units to be lifted into the enclosure.

PROJECT CASE STUDY - Serie 2 met randbeveiliging

Locatie van het project: Hereford, UK

Opdrachtgever: Integra Buildings/MTX Contracts

Opdrachtsom: £ 17 000,00

Productomschrijving: Serie 2 platform met relingen

Overview: This Series 2 platform replaced a large structural steel deck that was initially planned and saved many roof penetrations. This platform and guardrail surround was installed in just 1 day.

Project CASE STUDY - Serie 2 met randbeveiliging en loopbrug

Project: Cheltenham General Hospital

Projectlocatie: Cheltenham, UK

Client: Bairstow’s Mechanical Services

Value:  £ 18 000.00

Product Description: Series 2 platform with Guardrails and access walkway

Overview: This Series Platform provided for the mounting of 2 large units as well as an access walkway and stairs. Covering 2 roof levels our agile system could accommodate this and provide one level working surface for a large heat pump installation.

PROJECT CASE STUDY – Series 2 with Standard Screen

Project: Herinrichting Joods Huis

Projectlocatie: Gibraltar

Opdrachtgever: Interbuild gi

Value: £ 10 000.00

Product Description: Series 2 platform with 1.6m high Standard Screen

Overview: This 16m² Series 1 Platform with Standard Screen surround was supplied in kit form on one single pallet, with individual parts manually lifted to the roof and installed in 4 hours while training a Spanish installation team.

PROJECT CASE STUDY - Serie 2 met Soundshield

Projectnaam: James Paget University Hospital

Projectlocatie: Great Yarmouth, UK

Opdrachtgever: Eco Modular

Opdrachtsom: £ 38 000,00

Productomschrijving: Serie 2 platform met Soundshield scherm

Overview: This Series 2 platform made the ideal acoustic enclosure for the large AHU and other equipment. It was installed onto single ply with no roof penetrations and 2m high Soundshield acoustic screens to mitigate the sound. Main contractor Morgan Sindall were very happy with this solution on this new modular build A&E for an NHS project.

PROJECT CASE STUDY - Serie 2 met Soundshield

Project: Gants Hill studentenhuisvesting

Project Location: Gants Hill, UK

Client: Tide Construction

Value:  £ 36 000.00

Product Description: Series 2 Platform with Soundshield Screens

Overview: This Series 2 platform with 2m high Soundshield acoustic screens to all sides with 2 access doors, was provided for the 6 double VRV condensers. The pedestal feet were placed directly onto the warm roof insulation build-up and the ballast pebbles spread into position after installation of the deck framing.

PROJECT CASE STUDY - Serie 3 met randbeveiliging

Naam van het project: Kantoorgebouw Zurich

Projectlocatie: Swindon, UK

Opdrachtgever: Skanska Construction

Opdrachtsom: £ 13 000,00

Product omschrijving: Platform serie 3 met leuning en 2 x laddertoegang

Overzicht: Onder dit 2 m hoge platform van de serie 3 konden grote leidingen onder het platform worden gelegd, met Guardrail en twee ladders die toegang bieden via zelfsluitende poorten.

PROJECT CASE STUDY - Serie 3 met standaard scherm

Projectnaam: Northern School of Art

Projectlocatie: Middlesbrough

Opdrachtgever: BAM Construction

Opdrachtsom: £ 48 000,00

Productomschrijving: Serie 3 platform met 2,4m hoog Standaardscherm

Overzicht: Dit platform van de serie 3 werd ontworpen ter vervanging van de aanvankelijk meegeleverde stalen platformbehuizing, waardoor veel dakdoorvoeren werden bespaard en de omvang van de dragende stalen constructiedelen onder het dak werd verminderd. Een financieel, structureel voordeel en tijdwinst bij dit project.

PROJECT CASE STUDY - Serie 3 met tussenverdieping en standaard scherm

Projectnaam: John Radcliffe Ziekenhuis

Projectlocatie: Oxford, UK

Opdrachtgever: MTX Contracten

Opdrachtsom: £ 40 000,00

Productomschrijving: Serie 3 Platform met tussenverdieping

Overzicht: Deze oplossing maakte optimaal gebruik van de zeer beperkte ruimte door het toepassen van een tussenverdieping. Deze was toegankelijk via een trapladder met handrail. Onze H-ligger werd gebruikt voor de vrije overspanning. De standaard schermen waren doorlopend aan de buitenkant voor een zeer nette afwerking en afscherming van de apparatuur op beide niveaus.

PROJECT CASE STUDY - Serie 3 met randbeveiliging en constructies voor bovenleidingen

Project: William Harvey Ziekenhuis

Project: Ashford, Kent, UK

Opdrachtgever: MTX Contracten

Waarde: £ 119 000,00

Productomschrijving: Twee serie 3 platformen met bovenliggende kanaalsteunen

Overview: This solution provided for a level working area for the plant and equipment on the 2 roof spaces as well as provision to hang the ductwork from the overhead support structure. The roof had a gradient in 2 directions and steps where the building module connections were.

PROJECT CASE STUDY - Speedscreen met standaard scherm

Naam van het project: One Le Pole Square, kantoorontwikkeling voor gemengd gebruik

Projectlocatie: Dublin, Ierland

Opdrachtgever: JJ Rhatigan Building Contractors

Opdrachtsom: £ 22 360,00

Productomschrijving: Speedscreen-behuizing 2m hoog standaard

Overzicht: Deze 24m lange x 2m hoge vrijstaande Speedscreen omranding wordt bezwaard door betonnen ballastblokken. De installatie werd in 1 dag voltooid en vereiste slechts één kraanlift naar het dak.

PROJECT CASE STUDY - Speedscreen met standaard scherm

Naam van het project: Poole Hospital, operatiekamers

Projectlocatie: Poole, UK

Opdrachtgever: Integrated Health Projects JV

Opdrachtsom: £ 62 760,00

Product omschrijving: Speedscreen overdekking 2,4m hoog standaard

Overzicht: Deze 2,4 m hoge Speedscreen-installatie werd in 4 dagen voltooid en vereiste slechts één kraanlift naar het dak en leverde een omranding op met een totale afmeting van 27 x 10,2 m.

PROJECT CASE STUDY - Speedscreen met Louvre100

Naam van het project: RBK Kingston Dementie Verpleeghuis

Locatie van het project: Kingston, Londen

Opdrachtgever: Integrated Health Projects JV

Opdrachtsom: £ 72 430,00

Productbeschrijving: Speedscreen omranding 3,4m hoog Louvre100

Overview: This 45m long x 3.4m high non-penetrating surface mounted Speedscreen enclosure with louvred finish looked great from the road. There was a 1.5m high parapet, so the louvre stopped at 1.5m above the roof. Three access doors were provided to access in and out of the enclosure. This screen system was installed with all the plant in situ.

Copyright © 2020 Configured Platforms. Alle rechten voorbehouden.