PROJECT CASE STUDY – Series 1 with Soundshield Screen and Guardrail

Project Name: Premier Inn Extension Scarborough

Project Location: Scarborough, UK

Client: PDR Construction

Value: £ 16 000.00

Product Description: Series 1 platform with 1.6m high Soundshield Screen

Overview: This 42m² Series 1 Platform with Soundshield Screen surround on two sides was supplied to mount and mitigate the sound effect to the neighbours of the 10 Mitsubishi VRV units on this project

PROJECT CASE STUDY – Series 1 with Acoustic+ Screen and Standard Screen

Project Name: St James University Hospital, Pathology Lab – Leeds

Project Location: Leeds, West Yorkshire

Client: BAM Construction Ltd – North East

Value:  £ 185 000.00

Product Description: Series 1 platform with 3m high Acoustic+ screens with access landing and flue support structure.

Overview: Our solution eliminated a 200mm think concrete slab at roof height with all associated costs in time and hassle and allowed the roof to continue through over the complete area, significantly shortening the time it took to get the building to the watertight stage. With a total weight of 6 tonne instead of approximately 25-30 tonne this was a huge saving on the environment and well as the structural requirements. The complete 217m² 5kPa rated roof plant enclosure was installed in less than 2 weeks, with a crane required for one day only.

PROJECT CASE STUDY – Series 1 with Peacemaker and Roofed Plantroom

Project Name: 22 Wyvil Road

Project Location: London

Client: Kuropatwa Ltd

Value: £ 38 000.00

Product Description: Series 1 Platform with Peacemaker enclosure and roofed plantroom with no gaps to slats

Overview: This solution fulfilled the requirement of having air conditioning condensers needing airflow on one part of the platform and other equipment that needed to be in a plantroom. This complete structure was assembled in 2 days with the materials being brought to the roof via a materials hoist, as the site was very congested and would have required a road closure for a crane.

PROJECT CASE STUDY – Series 1 with Acoustic+ and overhead braces

Project Name: Lewisham Exchange Student Accommodation

Project Location: Lewisham, London

Client: Tide Construction

Value:  £ 17 000.00

Product Description: Series 1 platform with 2m high Acoustic+ screens

Overview: Due to the very constrained space down the side of the tallest modular building in the world this Acoustic+ enclosure was designed with overhead bracing to avoid having internal post braces. The base and sides were fabricated offsite to reduce the on-site build time to 3 hours.

PROJECT CASE STUDY – Series 1 with Peacemaker Screen and Louvred Roof

Project Name: 3-5 Crutched Friars

Project Location: London

Client: Zentura

Value: £ 19 000.00

Product Description: Series 1 platform with 2m Peacemaker screens and Louvred Roof

Overview: This acoustic enclosure was built off site and lifted to the roof as a completed unit. The louvred roof was removable and was lifted off to allow the 5 Daikin VRV units to be lifted into the enclosure.

PROJECT CASE STUDY – Series 2 with Guardrail

Project Location: Hereford, UK

Client: Integra Buildings/MTX Contracts

Value:  £ 17 000.00

Product Description: Series 2 platform with Guardrails

Overview: This Series 2 platform replaced a large structural steel deck that was initially planned and saved many roof penetrations. This platform and guardrail surround was installed in just 1 day.

PROJECT CASE STUDY – Series 2 with Guardrail and Access Walkway

Project Name: Cheltenham General Hospital

Project Location: Cheltenham, UK

Client: Bairstow’s Mechanical Services

Value:  £ 18 000.00

Product Description: Series 2 platform with Guardrails and access walkway

Overview: This Series Platform provided for the mounting of 2 large units as well as an access walkway and stairs. Covering 2 roof levels our agile system could accommodate this and provide one level working surface for a large heat pump installation.

PROJECT CASE STUDY – Series 2 with Standard Screen

Project Name: Jewish Home Refurbishment

Project Location: Gibraltar

Client: Interbuild gi

Value: £ 10 000.00

Product Description: Series 2 platform with 1.6m high Standard Screen

Overview: This 16m² Series 1 Platform with Standard Screen surround was supplied in kit form on one single pallet, with individual parts manually lifted to the roof and installed in 4 hours while training a Spanish installation team.

PROJECT CASE STUDY – Series 2 with Soundshield

Project Name: James Paget University Hospital

Project Location: Great Yarmouth, UK

Client: Eco Modular

Value:  £ 38 000.00

Product Description: Series 2 platform with Soundshield Screens

Overview: This Series 2 platform made the ideal acoustic enclosure for the large AHU and other equipment. It was installed onto single ply with no roof penetrations and 2m high Soundshield acoustic screens to mitigate the sound. Main contractor Morgan Sindall were very happy with this solution on this new modular build A&E for an NHS project.

PROJECT CASE STUDY – Series 2 with Soundshield

Project Name: Gants Hill Student Accommodation

Project Location: Gants Hill, UK

Client: Tide Construction

Value:  £ 36 000.00

Product Description: Series 2 Platform with Soundshield Screens

Overview: This Series 2 platform with 2m high Soundshield acoustic screens to all sides with 2 access doors, was provided for the 6 double VRV condensers. The pedestal feet were placed directly onto the warm roof insulation build-up and the ballast pebbles spread into position after installation of the deck framing.

PROJECT CASE STUDY – Series 3 with Guardrail

Project Name: Zurich Office Block

Project Location: Swindon, UK

Client: Skanska Construction

Value: £ 13 000.00

Product Description: Series 3 Platform with Guardrail and 2 x ladder access

Overview: This 2m high Series 3 platform allowed for large pipework to be run below the platform, with Guardrail and two step ladders providing access via self-closing gates.

PROJECT CASE STUDY – Series 3 with Standard Screen

Project Name: Northern School of Art

Project Location: Middlesbrough

Client: BAM Construction

Value: £ 48 000.00

Product Description: Series 3 platform with 2.4m high Standard Screen

Overview: This Series 3 platform was designed to replace the initially included structural steel platform enclosure, saving many roof penetrations as well as reducing the size of the supporting structural steel members below the roof. A financial, structural and timing advantage for this project.

PROJECT CASE STUDY – Series 3 with Mezzanine and Standard Screen

Project Name: John Radcliffe Hospital

Project Location: Oxford, UK

Client: MTX Contracts

Value: £ 40 000.00

Product Description: Series 3 Platform with Mezzanine Level

Overview: This Solution made the most of very limited space with a mezzanine level accessed by a hand railed step ladder. Our I-Bearer was used for providing the clear spanning structural element. The standard screens were continuous on the outside making a very tidy finish and screening off the equipment on both levels.

PROJECT CASE STUDY – Series 3 with Guardrail and Overhead Duct Support

Project Name: William Harvey Hospital

Project Location: Ashford, Kent, UK

Client: MTX Contracts

Value: £ 119 000.00

Product Description: Two Series 3 Platforms with Overhead Duct Support Structures

Overview: This solution provided for a level working area for the plant and equipment on the 2 roof spaces as well as provision to hang the ductwork from the overhead support structure. The roof had a gradient in 2 directions and steps where the building module connections were.

PROJECT CASE STUDY – Speedscreen with Standard Screen

Project Name: One Le Pole Square, Mixed Use Office Development

Project Location: Dublin, Ireland

Client: JJ Rhatigan Building Contractors

Value: £ 22 360.00

Product Description: Speedscreen enclosure 2m high standard

Overview: This 24m long x 2m high non-penetrating surface mounted freestanding Speedscreen enclosure is stabilised by concrete ballast blocks. The installation was completed in 1 day and required only one crane lift to the roof.

PROJECT CASE STUDY – Speedscreen with Standard Screen

Project Name: Poole Hospital, New Theatres

Project Location: Poole, UK

Client: Integrated Health Projects JV

Value: £ 62 760.00

Product Description: Speedscreen enclosure 2.4m high standard

Overview: This 2.4m high non-penetrating surface mounted Speedscreen installation was completed in 4 days and required only one crane lift to the roof and provided a plant enclosure with an overall size of 27 x 10.2m

PROJECT CASE STUDY – Speedscreen with Louvre100

Project Name: RBK Kingston Dementia Nursing Home

Project Location: Kingston, London

Client: Integrated Health Projects JV

Value: £ 72 430.00

Product Description: Speedscreen enclosure 3.4m high Louvre100

Overview: This 45m long x 3.4m high non-penetrating surface mounted Speedscreen enclosure with louvred finish looked great from the road. There was a 1.5m high parapet, so the louvre stopped at 1.5m above the roof. Three access doors were provided to access in and out of the enclosure. This screen system was installed with all the plant in situ.