To calculate the estimated time required on site to assemble a platform
- Input the length (along roof) measurement in millimetres
- Input the width (down roof) measurement in millimetres
- Select the screen height (if relevant)
- Select the surround types for relevant sides.
- Total “Man Days” are shown in the 1st ‘greyed’ box
- Input the number of persons in your team
- Total days required on site are shown in the 2nd ‘greyed’ box
This is an estimate based on many years of experience in varied site conditions but does not allow for site requirements not related directly to the platform i.e. access issues, induction sessions etc..
See links to our other calculators: