Product: Boltscreen
Overview: Explainer video of the Boltscreen system showing Boltscreen Post Foot brackets and the Boltscreen Jig.
Product: Parascreen
Overview: How to set-out Parascreen brackets using the Parascreen Jig.
Product: Series 3A
Overview: How to set-out the Series 3A framing. (This is a variation to the standard Series 3 framing)
Project Name: Queen Elizabeth Hospital, Kings Lynne
Project Overview: Plant Deck – Series 3 Platform 25200x9600mm with Guardrail to all
sides including 1 x access gate and lower deck and steps. Bearers are placed onto the module joints and double height cross supports span the distance.
Product: Guardrail
Overview: How to install the GR Post Foot.
Product: Series 2
Overview: How to install the Series 2 Interim Base Foot.